ICAMPS MineSim - Simulated Mining Features

 

Underground: The system simulates mining with any combination of longwall, continuous/conventional miner, miner borer or roadheader. Each mining unit can have its own mining rate, either in tonnage or in linear advance. The tonnages per shift can be specified as total material remove or processed tonnage. Each miner unit can have its own calendar and production capacity. An exception routine allows the mining rate to vary from month to month. A mining area can be divided into subareas to allow more than one miner unit to work within an area and each mining area or sub-area can have its own mining rate. The system also allows the user to specify a time offset between areas for construction or to move equipment. The system has provisions to adjust the mining rate as a function of difficulty code and seam height.

The simulated production model computes the advance and average quality parameters per time period using an iterative process. The parameter estimates are exact weighted averages based on the proportion of each grid block within the area mined each period.

Most mine plans must be adjusted to meet budget requirements. Where longwalls provide the bulk of the production, the longwall schedule can be adjusted automatically by modifying the machine calendars and production rates until the target tonnage is achieved. Based on the longwall schedule, the system will adjust the development machine calendars to reflect the shifting of crews for longwall moves. The timing is then run for all machines. Normally the total tonnage will be within an acceptable margin of the budget requirements. If the schedule does not meet the tonnage criteria, the user can adjust the longwall targets and repeat the scheduling process.
More MineSim
Prices
Demo
Updates
Surface: The system simulates mining by seam, or if the seam is very thick, by bench. A mine can operate in nine different seams concurrently and production from each seam can be segregated into seven layers. Each mining unit can have a different mining rate, expressed in volume per shift for overburden removal and tonnage per shift for ore production. In most deposits, the overburden thickness is an order of magnitude larger than the ore thickness. In these situations, ore production is controlled by the rate of overburden removal, and ore tonnages are reported when uncovered since the time to remove the ore is not significant. Where the deposit is very thick and ore must be removed in layers or benches, the ore production from each bench is scheduled based on the tonnage rate. The production quantity and quality computations are similar to the underground procedures.

In surface mining, frequently a minimum distance between adjacent machines must be maintained or an area must be mined before mining of an adjacent area can begin. The precedence relationships in the mining sequence include this information.

The surface mine scheduling can involve a mix of both underground and surface mining. The system is also well suited for scheduling underground mines and quarries where large off road equipment is used to remove the ore.
 

 